Imperial Steel Rectangular Racks

  • Intermediate sizes and special racks to drawing
  • Standard tolerances, unless otherwise stated ±0.010″
  • Standard: BS 436 Pt1, fig 1. Grade 8 / 9
  • All dimensions in inches except where shown
  • Steel EN8, (080M40/080M46/C45) normalised or equivalent
£28.02 (£33.62 UK, incl VAT)
7700-213
Intermediate sizes and special racks to drawing. Standard tolerances, unless otherwise stated ±0.010?. Standard: BS 436 Pt1, fig 1. Grade 8 / 9. All...
1-3 Working Days
+
Add to wish list

£32.93 (£39.52 UK, incl VAT)
7700-214
Intermediate sizes and special racks to drawing. Standard tolerances, unless otherwise stated ±0.010?. Standard: BS 436 Pt1, fig 1. Grade 8 / 9. All...
1-3 Working Days
+
Add to wish list

£44.32 (£53.18 UK, incl VAT)
7700-215
Intermediate sizes and special racks to drawing. Standard tolerances, unless otherwise stated ±0.010?. Standard: BS 436 Pt1, fig 1. Grade 8 / 9. All...
1-3 Working Days
+
Add to wish list

£80.54 (£96.65 UK, incl VAT)
7700-216
Intermediate sizes and special racks to drawing. Standard tolerances, unless otherwise stated ±0.010?. Standard: BS 436 Pt1, fig 1. Grade 8 / 9. All...
1-3 Working Days
+
Add to wish list

£25.90 (£31.08 UK, incl VAT)
7700-217
Intermediate sizes and special racks to drawing. Standard tolerances, unless otherwise stated ±0.010?. Standard: BS 436 Pt1, fig 1. Grade 8 / 9. All...
1-3 Working Days
+
Add to wish list

£30.45 (£36.54 UK, incl VAT)
7700-218
Intermediate sizes and special racks to drawing. Standard tolerances, unless otherwise stated ±0.010?. Standard: BS 436 Pt1, fig 1. Grade 8 / 9. All...
1-3 Working Days
+
Add to wish list

£38.24 (£45.89 UK, incl VAT)
7700-219
Intermediate sizes and special racks to drawing. Standard tolerances, unless otherwise stated ±0.010?. Standard: BS 436 Pt1, fig 1. Grade 8 / 9. All...
1-3 Working Days
+
Add to wish list

£69.54 (£83.45 UK, incl VAT)
7700-220
Intermediate sizes and special racks to drawing. Standard tolerances, unless otherwise stated ±0.010?. Standard: BS 436 Pt1, fig 1. Grade 8 / 9. All...
1-3 Working Days
+
Add to wish list